First — how do you actually tell if a meter might be running fast?
This is worth thinking through before making a formal request, because a meter test costs time and there are other explanations for a higher-than-expected bill that are more common than a faulty meter.
Signs that point more toward a legitimate meter issue:
- Your bill shows significantly higher consumption than you can account for based on your actual appliances and usage hours, even after carefully estimating
- The meter's display fluctuates or shows readings that seem to reset or jump unexpectedly
- The meter is physically damaged — cracked casing, water entry, burned terminals
- Your consumption pattern shows a sudden spike with absolutely no change in household appliances, occupants, or behavior
- After running your actual appliances through a rough calculation, the meter's recorded reading genuinely doesn't add up
Signs that more likely point to other causes:
- You crossed the 200-unit protected threshold (check this first — it accounts for the majority of "unexplained" bill increases)
- FPA was higher this month (confirm the FPA line on your bill against the current rate)
- An estimated reading ran high (check whether your bill says EST)
- You had guests, added an appliance, or ran AC for longer hours than usual this month
Going through this check genuinely matters — a meter test that confirms the meter is within tolerance doesn't adjust your bill, so if there's a more obvious explanation you'd catch it faster through the calculator or a complaint about an estimated reading.
How to formally request a meter test
Step 1 — Visit your subdivision office. Meter test requests are submitted in person, not through an online portal. Bring your CNIC and any recent bill that you believe reflects the inaccurate reading you're concerned about.
Step 2 — Submit a written application requesting a meter accuracy test. A simple letter stating: your reference number, your concern about inaccurate readings, the specific billing month or months you're questioning, and your request for a formal meter test. The subdivision office will log this as a formal complaint with a reference number.
Step 3 — Pay the meter testing fee. A nominal testing fee is charged upfront — currently in the range of Rs. 200 to Rs. 500 depending on your connection type. This fee is refunded or credited to your account if the meter is found to be running beyond the allowable tolerance.
Step 4 — Await the testing team's visit. A MEPCO technical team visits your premises to remove the meter and test it — either on-site or by taking it to the nearest meter testing facility. This typically happens within 7 to 15 working days of the request, though workload at your subdivision can affect timing.
Step 5 — Review the test result. The meter test produces a formal report showing the meter's accuracy as a percentage. NEPRA allows a tolerance band — a meter running within this band is considered accurate. If it's outside tolerance, the meter is confirmed faulty.
What happens if the meter is confirmed faulty
If the test confirms your meter was running faster than the allowable tolerance, two things typically follow:
The meter is replaced at MEPCO's cost, not yours, since the inaccuracy is attributed to equipment failure rather than any action on your part.
Your billing is reviewed for the affected period. The subdivision office will calculate a corrected estimate of what your bills should have been during the period the faulty meter was operating, and apply a credit adjustment to your account — usually reflected on the next one or two bills rather than as a cash refund.
The adjustment period and amount are calculated by the subdivision based on your corrected consumption estimate. If you disagree with how the adjustment was calculated, this is escalatable through the standard complaint process.
What happens if the meter tests as accurate
If the meter is within acceptable tolerance, no billing adjustment is made and the testing fee is not refunded. The meter is reinstalled and your bills continue on the same basis. This doesn't automatically mean your billing is wrong — it means the meter itself is functioning within the accepted range, and any discrepancy between your expectations and your bill is more likely attributable to one of the other causes (consumption pattern, FPA, estimated readings, or the 200-unit threshold).
Requesting a meter replacement (different from a test)
A meter replacement is a different request from a meter test and applies in different circumstances:
Physically damaged meter — cracked screen, water ingress, visible burning or sparking, or seals that appear tampered with (note: a tampered seal is different from a damaged seal and should be reported carefully — tampered seals can trigger an inspection rather than a routine replacement). Submit a written request at your subdivision office. If the damage is clearly accidental or weather-related and not due to tampering, MEPCO typically replaces the meter at standard rates or at no cost, depending on circumstances.
Meter not readable — if the meter's display has failed and cannot be read by either you or the meter reader, this is a basis for requesting replacement before estimation errors compound over multiple cycles.
Older meter model — older mechanical meters do have a higher rate of drift over time than newer digital meters, and if yours is clearly aged, requesting a replacement is reasonable even without a specific complaint about a single bill.
How long does the full process take?
From initial application to final resolution, realistically:
- Request submission and fee payment: 1 visit, same day
- Meter test team visit: 7 to 15 working days
- Test result: typically 1 to 2 days after the test visit
- Billing adjustment (if applicable): reflected within 1 to 2 billing cycles after confirmation
If you haven't received an update within 20 working days of submission, following up directly at the subdivision office with your complaint number is appropriate.
Frequently Asked Questions
How do I request a MEPCO meter test?
Visit your subdivision office with your CNIC and a recent bill, submit a written application requesting a meter accuracy test, pay the nominal testing fee, and a technical team will be scheduled to test your meter within 7 to 15 working days.
Is there a fee for requesting a meter test?
Yes, typically Rs. 200 to Rs. 500 depending on your connection type. This fee is refunded or credited if the meter is confirmed to be running beyond the allowable tolerance.
What happens if my meter is found to be faulty?
The meter is replaced at MEPCO's cost, and your billing is reviewed for the affected period with a credit adjustment applied to your account for the overbilled amount.
Can I request a meter test online?
Currently, meter test requests are handled in person at your subdivision office — there's no online submission option available through any official portal.
What is the allowed accuracy tolerance for MEPCO meters?
NEPRA sets the acceptable accuracy band for electricity meters. A meter reading within this tolerance is considered accurate even if it's not perfectly precise — it's only outside this band that the meter is classified as faulty and replacement becomes MEPCO's responsibility.
My meter seal looks different — should I report it?
Yes, but carefully. A broken or unusual seal should be reported to your subdivision office, not ignored — but how you report it matters. Frame it as an observation ("I noticed the seal looks different") and ask them to inspect and verify, rather than assuming anything or making an accusation. If the seal was tampered with by someone else or accidentally damaged, this protects your record. If it was genuinely tampered, the formal report from you pre-empts any future detection bill scenario.
Last updated: August 2026
File a billing complaint · What is EST on my bill? · Bill calculator · Detection bill guide